03 / 01
Define the actual deadline
A launch date, the date your fulfilment team needs empty boxes and the date goods leave the factory are different milestones. Confirm the delivery address, who assembles the box, who packs the product and whether onward distribution is needed.
Use the earlier operational need as the planning anchor. The arrival of empty packaging is not necessarily the same as readiness for sale or an event.
03 / 02
Map the dependencies backwards
This sequence shows dependencies rather than a promise that every task happens one after another. Some work may overlap, but the project team must confirm what can proceed and which approvals cannot be bypassed.
Review the development and production stages ↗03 / 03
Know when each lead time starts
| Stage | Reference | Starting conditions / limits |
|---|---|---|
| Sampling | 3–5 working days | After structure confirmation and final artwork |
| Standard production | 25–30 days | After sample approval and receipt of the agreed deposit |
| August–October peak production planning | 30–40 days | Confirm capacity, process and material availability for the order |
| Freight and local delivery | Route-specific | Separate from the production reference |
For the production references expressed in “days”, confirm the calendar basis in your quotation before turning them into dates. Do not assume they are working days. Revisions, special materials and order conditions can change the plan.
03 / 04
Allow for revisions and transport
Submitting artwork is not the same as approving it. Record who can sign off the structure, colour, finish and insert, and keep one current revision. Material availability and a revised sample can move later milestones.
Ask the freight provider for a route-specific plan and clarify the handover responsibilities. Set buffers around the actual risks; there is no single buffer or international transit time that fits every destination.
Prepare artwork for review ↗ · Agree inspection requirements ↗03 / 05
Keep one agreed milestone record
| Milestone | Completion condition | Owner | Target / confirmed date |
|---|---|---|---|
| Product & specification ready | To confirm | To confirm | To confirm |
| Artwork & sample approval | To confirm | To confirm | To confirm |
| Production start authorised | To confirm | To confirm | To confirm |
| Inspection & dispatch | To confirm | To confirm | To confirm |
| Arrival & packing readiness | To confirm | To confirm | To confirm |
Keep requested and confirmed dates in separate fields, then record changes, open risks and the next action. The download includes those additional fields.
03 / 06
If the date is tight, send the complete picture
Send the quantity, specification, artwork stage, sample status, destination and required dispatch and arrival dates. Identify the features that can change. Suiyuan reviews capacity and the process route before confirming any expedited plan in writing.
Review trade project planning ↗A TOOL FOR YOUR OWN PROJECT
Your project milestone worksheet
Blank planning worksheet. Enter your own project information; no example prices, savings or promised dates are supplied.
Download the blank worksheet · English CSV ↓Open in a spreadsheet application. The website does not collect or save your entries.
Planning guidance based on Suiyuan’s confirmed business information. Project specifications, commercial terms and dates are confirmed in the written quotation and order agreement. Worksheets are blank tools, not client case records.