Separate the approvals
A white sample confirms structure. A decorated sample confirms paper, print and finish. Keep a clear revision number so the team knows which version is approved.
Confirm the production reference
Record the dimensions, board, paper, print references, decoration and insert construction. Retain an approved sample on both sides where practical.
THE DECISION TO KEEP
A sample is a decision tool; the signed reference is the production standard. Record exactly which version and components were approved.
Understand the schedule
Allow an indicative 3–5 working days for sampling after structure confirmation and final artwork. Mass production is typically planned at 25–30 days after sample approval and deposit; confirm your specific order schedule.
Review before dispatch
Agree the checks, photos, packing method and acceptance criteria before production begins. Your final inspection should compare against the approved reference.
A PRACTICAL DECISION REFERENCE
Separate the approvals clearly.
| The decision | What to identify | What to review |
|---|---|---|
| White structural sample | Geometry and interaction | Fit, opening, product removal and packing sequence |
| Decorated sample | Materials and visual finish | Paper, print, foil, wrapping and insert appearance |
| Signed production reference | Agreed order standard | Revision, materials, drawings and acceptance criteria |
| First-off review | The beginning of the actual run | Compare critical details with the approved reference |
| Final inspection | Finished units and packing | Inspect agreed criteria and dispatch configuration |
Keep a sample approval record
Record the product component revisions, drawing or dieline, artwork file, board, paper, insert and finish used. Note each change and whether the sample is approved for structure, decoration or the complete order. A photograph without that context can be interpreted differently by design, purchasing and production teams.
Do not start the clock before the inputs exist
Sampling requires dimensions, relevant products and a usable brief. Decorated sampling also depends on artwork, selected stock and any required tooling. Production depends on final approval and the agreed commercial inputs. State the trigger for each date in the quotation so the launch plan is based on the same assumptions.
A Suiyuan packaging development guide. Confirm order-specific values, material evidence and approval criteria with the factory team.